Base Civil has recently completed a rural subdivision in Matangi on behalf of Blue Wallace Surveyors.
The roadway was formed with over 4,000m3 of cut to fill taking place. A swale drain was formed either side of the road which included 24 catchpit soakholes and 950m of subsoil drainage. This made way for a solid 500mm deep pavement.
Water, power and telecommunications were provided to each of the 8 generously sized lots. Each section was completed with a sealed entranceway.
We worked hard along with the decent weather in order to get the project finished with time to spare. The immaculate finish will no doubt make these attractive buys. Get in quick, these sections won’t last long.